Solar care + roofing. One place to start.24/7 dispatch line · (719) 418-1751
SAVE OUR
SOLAR CLUB
HOMEOWNER GUIDE

Replacing your roof
when you have solar.

Get the roofing and solar parts of your project aligned before work starts.

Start with the roof and the array

Collect roof age, roof material, solar installation date, equipment documentation and any active warranty documents. Explain the reason for replacement and whether leaks or damage appear near mounting points. An assessment should distinguish the roof scope from the solar scope.

Put responsibilities in writing

Your proposal should identify who disconnects and removes the equipment, who stores it, who performs roofing work, and who reinstalls and tests the array. Ask which party is responsible for mounting attachments, flashing and roof penetrations. Confirm how hidden damage or incompatible mounting hardware would be handled.

Confirm the local requirements

Permits, electrical inspections and utility notifications depend on the jurisdiction and scope. Ask your project provider to identify the applicable authority and requirements. A city information link is a starting point, not a substitute for verifying rules for your property.

Plan for downtime and safe storage

Your solar system will not produce normally while it is disconnected. Ask for the planned removal and reset dates, access needs, panel storage location, weather contingencies and a process for documenting equipment condition.

Close the project with records

Request completion photos, inspection records where applicable, system testing results and a monitoring check. Keep the roofing and solar agreements together, including written warranty terms and future service contacts.

Discuss your roof + solar project
LET’S TAKE CARE OF YOUR HOME

A stronger roof.
A brighter outlook.

Tell us what’s happening. We’ll help you find the next step.

Start your request